Hi team,
I have a question how can i start a tape job.
We have currently the following test lab.
Location A :
VBR installtion
Backup Job (testVM)
With a backup copyjob we transfer the data to a repro that is located location B
Location B.
VBR with a Tape infrastructure
The goal is that the Tape Job (Location B) starts when the backup copyjob (location A) is finished.
How can i select that copjob in the scheduler of the TapeJob (location B)?
Thanks for your help.
Regards,
Oliver
I have a question how can i start a tape job.
We have currently the following test lab.
Location A :
VBR installtion
Backup Job (testVM)
With a backup copyjob we transfer the data to a repro that is located location B
Location B.
VBR with a Tape infrastructure
The goal is that the Tape Job (Location B) starts when the backup copyjob (location A) is finished.
How can i select that copjob in the scheduler of the TapeJob (location B)?
Thanks for your help.
Regards,
Oliver
Statistics: Posted by OMW72 — Jul 02, 2025 6:55 am





