I currently manage 11 different VBR deployments, and I would like to start doing from from a single jumpbox instead of using RDP to connect to each server. The update timeline for these systems spans a 3-4 month timeline. Do you mean that, if the ISO changes within that time (even if the build number remains the same), my existing Console will no longer connect to the newly updated servers?
Statistics: Posted by RubinCompServ — May 05, 2025 3:08 pm




