I would like to ask for some clarification on whether this is achievable.
I plan to migrate the existing VBM365 v8.1 from the on-premise server room to the remote data centre.
The existing on-premise backup repository is attached as VMware VMDK.
Can I manually migrate all of the backup repository content to the Cloud Object Storage like Wasabi and then deploy the new VBM365 v8.1 to continue the incremental backup?
The goal here is to avoid long full backups which take a very long time.
Thank you in advance.
I plan to migrate the existing VBM365 v8.1 from the on-premise server room to the remote data centre.
The existing on-premise backup repository is attached as VMware VMDK.
Can I manually migrate all of the backup repository content to the Cloud Object Storage like Wasabi and then deploy the new VBM365 v8.1 to continue the incremental backup?
The goal here is to avoid long full backups which take a very long time.
Thank you in advance.
Statistics: Posted by albertwt — Apr 08, 2025 2:44 am