I am going through the suggested documents. I really thought there would be a simple copy option by right clicking on a backup job. I don't want to make a mistake.
I believe one suggestion is to copy or move all the backup jobs from the capacity tier to the performance tier, but the performance tier doesn't have the space available.
I believe one suggestion is to copy or move all the backup jobs from the capacity tier to the performance tier, but the performance tier doesn't have the space available.
Statistics: Posted by suntech — Mar 17, 2025 2:35 pm






